Survey

You are here: Energy Curves / Survey

1. What are the details of the respondent?

Please provide your contact details. These details will not be shared or used for commercial gain. Your email will be used to send your survey results as soon as possible.

2. What is your comminution circuit throughput?

Please fill in the throughput of the mine in question. More detailed recent data (top of the list) is the most critical, but if you can provide information for all three boxes, please do so. If data may appear confusing, please add comments in the final field.

3. What is your annual metal production rate?

Please fill in the metal production of the mine in question. If data may appear confusing, please add comments in the final field. This information can be found in annual or quarterly reports.

4. What is the annual total energy consumption of your mine?

Please fill in the total annual energy usage of the mine in question. The preference is to provide a breakdown of energy into electrical and diesel consumption, but if not available, please just fill in the total energy consumption. If the data is in different units, please provide the units or use conversion factors available Here. This data may be obtained from sustainability reports or from energy manager.

5. What is your average measured equipment power usage?

Please fill in the installed or averaged power of the various equipment in the comminution circuit of the mine in question. The preference will be if you can provide averaged operating power of the equipment and the installed power. This data may be obtained from plant metallurgist or asset register.

5a. Installed

5b. Operating

6. What measure of ore competence can you provide?

Please fill in any data you can provide for the competence of the ore over the period of reporting. This information may be obtained from plant metallurgist or lab reports.

7. What are the P80s down the circuit?

Please fill in the size through which 80% of the mass passes (P80) down the circuit of the mine in question. If P80s are not available down the circuit, feed and product will be sufficient. This information may be obtained from the plant metallurgist or as a last resort design specifications.
8 * 2 =

Thank You

Thank you for submitting this data, we will email the identified position of this mine in the database to you as soon as possible. If you want to send some extra information that may provide more detailed information (flowsheets, Excel files, SimMet files, etc.) please email comms@ceecthefuture.org

energy curves cutout

SIGN UP FOR OUR MONTHLY NEWSLETTER