Paz, Ypelaan, Ryan, McInnes
Presented at the AusIMM Mill Operators Conference June 2021
ABSTRACT
The Anglo Gold Ashanti (AGA) Sunrise Dam Gold Recovery Enhancement Project (REP) was an upgrade project to the existing process plant to increase gold recovery. The project required the existing screened cyclone overflow to be redirected into a new flotation and ultra-fine grinding circuit, producing concentrate up to a rate of 400000t/a.
MetsoOutotec supplied six TC200Tank Cell®flotation units, one 14m High Rate Thickener and one HIGmill®HIG3500/23000. At this point in time the HIGmill is the world’slargest stirred mill supplied into a pyrite concentrate regrind duty.
This paper discusses the HIGmill test work and sizing, the challenges of commissioning and ramp-upand subsequent design optimisations.The energy efficiency and operational performanceis also discussed.
ACKNOWLEDGEMENTS
The authors would like to thank AngloGold Ashanti Australia Ltd and MetsoOutotec for permission to publish this work.
AUTHORS
A Paz1, C Ypelaan2, T Ryan3and M McInnes4
1.Senior Process Engineer, Metso Outotec, Perth WA 6005. Email:
2. Metallurgical Superintendent, AngloGoldAshanti Australia Ltd, Sunrise Dam, Laverton WA 6440. Email:
3. Manager Engineering Support, AngloGoldAshanti Australia Ltd, Sunrise Dam, Laverton WA 6440. Email:
4. Director Service Technical Support, Metso Outotec, Perth WA 6005. Email:
If you are interested in purchasing proceedings or abstracts, please use this link.